https://198728.deltapointhk.tech/wp-content/uploads/2023/05/GOLD-FIELDS.jpg

Gold Fields

Title:

Description:

GOLD-FIELDS-1280x969.jpg

Gold FieldsFresh Water Propulsion System

Propulsion system from well water zone up to water transfer tank and fresh water tank. Includes the installation of 10 Km of 8” Steel pipe and 6Km of 14” HDPE pipe, plus all associated civil Works. Located at more tan 4.400 m.a.s.l.
Category
Mining
Año
2021
Ubicación
III Región de Atacama

Bitnami