ORMAT-25-640x640.jpg

June 9, 2017by Rodrigo Prieto

Construction and electro-mechanical assembly of a 50MW geothermal plant. Project successfully executed in the Ollagüe area, that took 600,000 man/hours with staff working at 4,600 meters above sea level, in high mountain conditions, facing low temperatures and strong winds.


comasa-03-cuadrado.jpg

February 10, 2017by Rodrigo Prieto

Engineering, supply and assembly of a 22 MW power plant, using agricultural Biomass (straw) to inject energy to the SIC. Includes a straw managing system, boiler feeder, assembly of the boiler and turbo-generator, auxiliary parts and gas abatement system.


PES-ENEL-GREEN-POWER19-cuadrado.jpg

June 12, 2016by Rodrigo Prieto

Construction and electro-mechanical assembly of the interconnection system between the different pits and the 50MW geothermal plant. Consists of the construction of stations for separation of solid materials, station for the re-injection and pumping of condensed material, plus 15 kilometers of pipeline to connect the plant and 6 extraction and re-injection pits. Project successfully executed in the Ollagüe area, that took 400,000 man/hours with staff working at 4,600 meters above sea level, in high mountain conditions, facing low temperatures and strong winds.


russfin14-cuadrado.jpg

June 9, 2002by Rodrigo Prieto

Conceptual, basic and detail engineering, equipment selection, construction and electromechanical assembly of a co-generation 1.2MW central station using forestry biomass, for a lenga wood sawmill in the middle of Tierra del Fuego, Patagonia.